Caliper
Caliper
Caliper
Non Destructive Testing
This standard operating procedure describes the techniques for both dry and wet magnetic particle testing on ferromagnetic materials, for surface and sub-surface discontinuities. It is important that MPI is done before and after load testing to ensure that there are no defects or any cracks within the welding area (of lifting points / stress points).
About Our Company
CIC aims to be a comprehensive service provider of Specialized Inspection services to local and overseas Oil and Gas companies. Our range of services includes full range of Non-Destructive Testing (NDT) Inspection, Oil Country Tubular Goods (OCTG) Inspection & Maintenance, Hard bending, & Lifting Equipment’s & Gear Inspection.
OUR COMPANY MISSION
We believe that the end results of a solution provided greatly depends on the quality of service it delivers professional expertise involve in its operations. We have a vision to provide a solution that will be able to satisfy our customers with assurance and constant fulfilment in areas of Load testing, Inspection and certification. With our constant innovation in areas of technological advancement and management commitment we plan to integrate our systems to make information accessible for customers’ engagement.
Our Services
we are proud of We Do
We offer the pressure test services to identify weak spots as well as to improve product design. The test is performed by using high pressure to check if there is a pressure drop caused by an unintended crack or hole.
Calibration
We offer 3rd Party calibrating services from accredited calibration Laboratory.
Inspection of oil country tubular goods
- Heavy Weight Drill Pipes, Drill Collars, Casing.
- Tubing and Bottom Hole Assembly.
- Inspection Services in offer are:
- Electromagnetic inspection unit – EMI for Drill Pipe Body Inspection.
We offer inspection and certification services for all lifting equipment including lifting appliances and lifting tackles. Our independent inspection, carried out in accordance with all applicable standards, codes, regulation and best engineering practices ensures all statutory and regulatory requirements are met.
Shackles/ Chains / Wire Rope / Hook / Synthetic Slings Visual inspection is done to ensure there isn’t any significant damage wear, or abrasion. Recent cases have shown many accidents that caused injury or even deaths from sling or wire rope failure. Weights & Testing have qualified team to visually inspect and will no doubt reject any equipment that is liable of failure.
This standard operating procedure describes the techniques for both dry and wet magnetic particle testing on ferromagnetic materials, for surface and sub-surface discontinuities. It is important that MPI is done before and after load testing to ensure that there are no defects or any cracks within the welding area (of lifting points / stress points).
our company safety Statistics
Address:
Villa # 24/12, Harshem-1,Erbil,
Kurdistan Region of Iraq
Custom Support & Sale:
+964 750 162 0872
+964 750 714 1869
E-mail:
info@ciciraq.com